subject
Physics, 10.09.2019 17:30 imstupid77

Abatch of parts is produced on a semi-automated production machine in a sequential batch production operation. batch quantity is 300 units. setup takes 55 min. a worker loads and unloads the machine each cycle, which takes 0.75 min. machine processing time is 3.46 min/cycle, and tool handling time is negligible. one part is produced each cycle. determine (a) average cycle time, (b) time to complete the batch, and (c) average production rate.

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 19:30
Can somebody explain to me how newton's 3rd law relates to momentum? ~ap physics 1
Answers: 2
question
Physics, 21.06.2019 21:20
Jason is a body builder. despite being more fit, he weighs more than his brother ryan, who is the same height. which is a possible reason? a. jason has more muscle mass than ryan does. b. jason has more body fat than ryan does. c. jason has more muscle mass and body fat than ryan does d. jason has less body fat than ryan does.
Answers: 1
question
Physics, 21.06.2019 23:00
1point) a skydiver weighing 130 lb (including equipment) falls vertically downward from an altitude of 14,000 ft and opens the parachute after 20 s of free fall. assume that the force of air resistance, which is directed opposite to the velocity, is of magnitude 0.85|v|0.85|v| when the parachute is closed and is of magnitude 17|v|17|v| when the parachute is open, where the velocity vv is measured in ft/s. assume that acceleration due to gravity has magnitude 32 ft/s/s; remember that weight is the product of mass and gravitational acceleration. find the speed of the skydiver when the parachute opens. speed is 150.6121788 ft/s find the skydiver's height when the parachute opens. height is 2338.98591 ft find the limiting velocity vlvl after the parachute opens. (think about whether this should be positive or negative.) vl=vl= 7.647 ft/s
Answers: 2
question
Physics, 22.06.2019 12:10
Aspring has a natural length of 8 m. if a 12-n force is required to keep it stretched to a length of 10 m, how much work w is required to stretch it from 8 m to 16 m? (round your answer to two decimal places.)
Answers: 1
You know the right answer?
Abatch of parts is produced on a semi-automated production machine in a sequential batch production...
Questions
Questions on the website: 13722360