subject
Physics, 22.08.2019 03:10 bedsaul12345

Ll be profitable if the average wind speed at the proposed turbine site is more than 8 mph. for a site north of west lafayette, the wind speed was monitored every 8 hours for a one year period. a total of 1095 readings had an average speed of 8.319 mph with a standard deviation of 3.909. an appropriate 1-sided hypothesis test was conducted to test whether the average wind speed at the site is more than 8 mph. which of the below would be a type i error for this test?

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 04:30
The graph describes the motion of an object. the object moves with from a to b. it from b to c. it moves with from c to d.
Answers: 1
question
Physics, 22.06.2019 09:30
Why are graphs useful when interpreting data
Answers: 2
question
Physics, 22.06.2019 10:30
The precision of a laboratory instrument is ± 0.05 g. the accepted value for your measurement is 7.92 g. which measurements are in the accepted range? check all that apply. 7.85 g 7.89 g 7.91 g 7.97 g 7.99 g
Answers: 1
question
Physics, 22.06.2019 17:30
Me with this and you will be marked brainliest
Answers: 2
You know the right answer?
Ll be profitable if the average wind speed at the proposed turbine site is more than 8 mph. for a si...
Questions
question
History, 03.12.2021 14:00
question
Mathematics, 03.12.2021 14:00
question
Mathematics, 03.12.2021 14:00
question
History, 03.12.2021 14:00
question
Spanish, 03.12.2021 14:00
Questions on the website: 13722361