subject
Physics, 30.07.2019 21:10 dee2970

You are working as part of a network installation team. your team has been asked to install cat 5e cabling to some new offices on the second floor of the building. currently, the office only has one network closet which is located on the first floor. your team spent the morning running 48 new cat 5e cables from a patch panel in the networking closet on the first floor to a new networking closet you are outfitting on the second floor. your team terminated these cables in a new patch panel in the 2nd floor closet. you measured the distance from the switch in the 1st floor closet to the new second floor patch panel and determined it was 80 meters. the team then ran cables from this patch panel to each of the new offices. some of the offices are working properly, but others are not. you suspect that some of the cable runs are exceeding the maximum length allowed by cat 5e cabling. what is the best solution to this problem?

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 22:40
Explain vector addition, triangle method and parallelogram method
Answers: 1
question
Physics, 22.06.2019 05:20
Which statement is true? a. kepler's laws apply only to the motion of earth. b. kepler's laws can be used to predict eclipses. c. kepler's laws are true for a central force that is directly proportional to distance. d. kepler's laws can be deduced from newton's laws of motion and gravity.
Answers: 2
question
Physics, 22.06.2019 15:10
Difference between series and parallel circuits
Answers: 3
question
Physics, 22.06.2019 15:30
What are the north and south poles of a solenoid change with?
Answers: 1
You know the right answer?
You are working as part of a network installation team. your team has been asked to install cat 5e c...
Questions
question
Mathematics, 10.03.2021 22:10
question
Mathematics, 10.03.2021 22:10
question
Mathematics, 10.03.2021 22:10
question
Mathematics, 10.03.2021 22:10
question
Mathematics, 10.03.2021 22:10
Questions on the website: 13722362