subject
Physics, 19.07.2019 01:10 schoolwannapass

How much work is done lifting a 12-m chain that is initially coiled on the ground and has a density 2 kg/m so that its top end is 8 m above the ground? (assume that acceleration due to gravity is g = 9.8 m/s2.)

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 19:30
Agymnast dismounts off the uneven bars in a tuck position with a radius of 0.3m (assume she is a solid sphere) and an angular velocity of 2rev/s. during the dismount she stretches out into the straight position, with a length of 1.5m, (assume she is a uniform rod through the center) for her landing. the gymnast has a mass of 50kg. what is her angular velocity in the straight position?
Answers: 3
question
Physics, 21.06.2019 23:20
Imagine you had to physically add electrons, one at a time, to a previously neutral conductor. you add one electron very easily, but the second electron requires more work. in your initial post to the discussion, explain why this is. also, what happens to the work needed to add the third, fourth, fifth, and subsequent electrons
Answers: 1
question
Physics, 22.06.2019 17:00
If you put a helium-filled balloon in the refrigerator, what will happen?
Answers: 1
question
Physics, 22.06.2019 17:00
Abowling ball rolling down the lane toward the pins has gravitational potential energy. a. no b. a lot of c. a little
Answers: 2
You know the right answer?
How much work is done lifting a 12-m chain that is initially coiled on the ground and has a density...
Questions
question
Mathematics, 20.09.2019 18:20
question
Biology, 20.09.2019 18:20
question
Chemistry, 20.09.2019 18:20
question
Mathematics, 20.09.2019 18:20
question
English, 20.09.2019 18:20
Questions on the website: 13722367