subject
Physics, 16.07.2019 05:20 avaleasim

An assembly line with 17 tasks is to be balanced. the longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. the line will operate for 450 minutes per day. a. what are the minimum and maximum cycle times? b. what range of output is theoretically possible for the line? c. what is the minimum number of work stations needed if the maximum output rate is to be sought? d. what cycle time will provide an output rate of 125 units per day? e. what output potential will result if the cycle time is (1) 9 minutes? (2) 15 minutes?

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 01:30
The transfer of heat through the movement of a gas or liquid a. convection b. conduction c. radiation
Answers: 2
question
Physics, 22.06.2019 18:30
Two trains leave a station at the same time, train a travels at a constant speed of 16 m/s. train b starts at 8.0 m/s but accelerates constantly at 1.0 m/s squared. after 10.0 seconds, which train has the greater speed?
Answers: 1
question
Physics, 22.06.2019 20:20
Consider a file currently consisting of 200 blocks. assume that the file control block (and the index block in the case of indexed allocation) is already in memory. calculate how many disk i/o operations are required for contiguous, linked, and indexed (single-level) allocation strategies, for each of the conditions listed below. in the contiguous-allocation case, assume that there is not room to grow at the beginning but there is room to grow at the end. also assume that the block information to be added is stored in memory.
Answers: 3
question
Physics, 22.06.2019 23:10
Atorque acting on an object tends to produce a. equilibrium b. rotation c. linear motion d. velocity e. a center of gravity
Answers: 2
You know the right answer?
An assembly line with 17 tasks is to be balanced. the longest task is 2.4 minutes, and the total tim...