subject
Physics, 17.10.2019 10:00 dontcareanyonemo

An electric furnace is to melt 40 kg of aluminium/hour. the initial temperature of aluminium is 32°c. given that aluminium has specific heat capacity 950 j/kg k melting point 680*c, latent heat of fusion 450 kj/kg, the efficiency of furnace is 85% and cost of energy is 20 cents/kwhr calculate: (a) power required (b) the cost of operating the furnace for 30 hours

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 21:00
Which type of circuit is becoming more common in residential electrical design and construction? a. hazardous-area circuit b. three-phase circuit c. 480-volt circuit d. communication circuit
Answers: 1
question
Physics, 22.06.2019 11:30
If the chemical properties of a substance remain unchanged and appearance or shape of a substance changes it is called a ?
Answers: 1
question
Physics, 22.06.2019 12:10
Light traveling in water, nwater = 1.33, strikes a plastic block at an angle of incidence of 51.4°; part of the beam is reflected and part is refracted. if the index of refraction of the plastic is 2.0, what is the angle made by the reflected and refracted beams?
Answers: 2
question
Physics, 22.06.2019 17:50
Two identical stars with mass m orbit around their center of mass. each orbit is circular and has radius r, so that the two stars are always on opposite sides of the circle. (a) find the gravitational force of one star on the other. (b) find the orbital speed of each star and the period of the orbit. (c) how much energy would be required to separate the two stars to infinity?
Answers: 1
You know the right answer?
An electric furnace is to melt 40 kg of aluminium/hour. the initial temperature of aluminium is 32°c...
Questions
question
Mathematics, 03.08.2019 15:00
Questions on the website: 13722363