subject
Physics, 22.06.2019 19:50 nadiareese

Aleaky 10-kg bucket is lifted from the ground to a height of 15 m at a constant speed with a rope that weighs 0.7 kg/m. initially the bucket contains 45 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 15-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.) lim n → ∞ n (9.8)(45−3 xi) i = 1 δx express the work as an integral. 0 dx evaluate the integral. (round your answer to the nearest integer.) j

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 23:30
The photo above shows oil and vinegar in a pitcher. the top make a claim about about the density of the vinegar compared to the density of the oil summarize the evidence to support the claim and explain your reasoning
Answers: 3
question
Physics, 23.06.2019 02:10
You have a resistor and a capacitor of unknown values. first, you charge the capacitor and discharge it through the resistor. by monitoring the capacitor voltage on an oscilloscope, you see that the voltage decays to half its initial value in 3.00 ms . you then use the resistor and capacitor to make a low-pass filter. what is the crossover frequency fc?
Answers: 1
question
Physics, 23.06.2019 02:20
If 130 j of energy were added to 1 kg of each of the samples listed in the answer choices, which would experience the greatest temperature increase
Answers: 2
question
Physics, 23.06.2019 07:40
The resistance of 100 w bulb is less than resistance of 40 w bulb. explain the reason.
Answers: 1
You know the right answer?
Aleaky 10-kg bucket is lifted from the ground to a height of 15 m at a constant speed with a rope th...
Questions
question
Physics, 14.05.2021 04:00
question
Mathematics, 14.05.2021 04:00
Questions on the website: 13722360