subject
Physics, 05.11.2019 13:31 stmy1969

Aleaky 10-kg bucket is lifted from the ground to a height of 16 m at a constant speed with a rope that weighs 0.7 kg/m. initially the bucket contains 48 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 16-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.)

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 22:30
A1200 kg car traveling north at 10 m/s is rear-ended by a 2000 kg truck traveling at 30 m/s. what is the total momentum before and after the collision?
Answers: 3
question
Physics, 22.06.2019 09:10
Which lists the organs in the correct order as food passes from the mouth to anus?
Answers: 1
question
Physics, 22.06.2019 15:00
What pressure difference is required between the ends of a 2.0-m-long, 1.0-mm-diameter horizontal tube for 40 c water to flow through it at an average speed of 4.0 m/s?
Answers: 1
question
Physics, 22.06.2019 15:00
A10 kg box initially at rest is pulled 18 meters across a horizontal, frictionless surface by a 40 n force. what is the block’s final velocity over the 18 meters?
Answers: 2
You know the right answer?
Aleaky 10-kg bucket is lifted from the ground to a height of 16 m at a constant speed with a rope th...
Questions
question
Mathematics, 24.11.2020 14:00
question
Social Studies, 24.11.2020 14:00
question
Physics, 24.11.2020 14:00
question
Mathematics, 24.11.2020 14:00
question
English, 24.11.2020 14:00
question
Physics, 24.11.2020 14:00
question
Chemistry, 24.11.2020 14:00
question
English, 24.11.2020 14:00
Questions on the website: 13722367