subject
Physics, 28.01.2020 21:05 hernsl0263

The potential at a point a is 30 v higher than at point b. how much work would you do moving 4.0 c charge from b to a?

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 23:00
Athermometer is removed from a room where the temperature is 70° f and is taken outside, where the air temperature is 10° f. after one-half minute the thermometer reads 60° f. what is the reading of the thermometer at t = 1 min? (round your answer to two decimal places.) ° f how long will it take for the thermometer to reach 30° f? (round your answer to two decimal places.)
Answers: 3
question
Physics, 22.06.2019 09:00
As a pendulum bob swings back and forth several times, the maximum height it reaches becomes less and less. this is because more and more of the pendulum bob's energy is being transformed into a. heat energy b. kinetic energy c. potential energy d. kinetic energy and potential energy
Answers: 2
question
Physics, 23.06.2019 03:00
Suppose that a cylindrical tank 6 meters high with a radius of 2 meters is filled to the rim with water. the tank is buried so that the top of the tank is 1 meter below ground level. the space above the tank is not filled with water. calculate how much work needs to be done by a pump to pump the water out of the tank up to ground level. (the water weighs 9,800 newtons per cubic meter.)
Answers: 2
question
Physics, 23.06.2019 06:40
Why does magnet 5 float above magnet 4
Answers: 1
You know the right answer?
The potential at a point a is 30 v higher than at point b. how much work would you do moving 4.0 c c...
Questions
question
English, 18.10.2021 06:20
question
Mathematics, 18.10.2021 06:20
question
Mathematics, 18.10.2021 06:20
question
Mathematics, 18.10.2021 06:20
Questions on the website: 13722367