subject
Physics, 01.07.2019 18:30 jimena15

Motion is defined as a change in question 1 options: location position speed none of the above

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 18:00
Which of the following changes to a pipe would increase the conductance by a factor of 12? 1.quadrupling the length and tripling the radius.2.reducing the length by a factor of and doubling the radius.3.tripling the length and reducing the radius by a factor of .4.reducing the length but a factor of and doubling the radius.
Answers: 3
question
Physics, 22.06.2019 03:30
Aplane flies a distance d from west to east at a constant speed vp , with respect to the air in a time twe . on the return trip, the plane flies a distance d from east to west at a constant speed vp , with respect to the air in a time tew . on both trips the wind blows from west to east at a constant speed va , with respect to the ground 1) what is tew in terms of vp, va, and d, as needed? tew=dvp tew=dvp+va tew=dva tew=dvpâ’va tew=12dvp tew=12dvp+va tew=12dvpâ’va your submissions: b submitted: saturday, january 26 at 6: 49 pm feedback: feedback will be given once all questions have been attempted and the grade cluster button has been pressed. 2) what is twe in terms of vp, va, and d, as needed? twe=dvp twe=dvp+va twe=dva twe=dvpâ’va twe=12dvp twe=12dvp+va twe=12dvpâ’va your submissions: d submitted: saturday, january 26 at 6: 49 pm feedback: feedback will be given once all questions have been attempted and the grade cluster button has been pressed. 3) assuming d = 2300 miles, vp = 400 miles/hr, and twe = 4 hours, what is va, the speed of the wind with respect to the ground? va = 100 miles/hr va = 575 miles/hr va = 200 miles/hr va = 175 miles/hr va = 975 miles/hr 4) once again, assuming d = 2300 miles, vp = 400 miles/hr, and twe = 4 hours, what is tew, the time it takes the plane to fly a distance d miles from east to west? tew = 5.75 hours tew = 11.5 hours tew = 7.67 hours tew = 8 hours tew = 10.2 hours
Answers: 2
question
Physics, 22.06.2019 07:00
Ineed the answers for these promblems i have
Answers: 3
question
Physics, 22.06.2019 13:40
Use the profile illustrated for problem (1). assume that the layer of silty sand fill (sm) is placed over the entire site. estimate the thickness of the fill (h - in feet) that will cause the effective vertical stress at the center of the clay layer to increase by 517.5 pounds per square foot.
Answers: 1
You know the right answer?
Motion is defined as a change in question 1 options: location position speed none of the above...
Questions
question
English, 08.04.2020 02:56
question
Mathematics, 08.04.2020 02:56
question
Mathematics, 08.04.2020 02:56
Questions on the website: 13722367