In three hours, manufacturer z can make b ball bearings. manufacturer y can make b ball bearings in 4 hours. manufacturer x can make b ball bearings in 6 hours. working together, how long will it take all three plants to make b ball bearings?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:40
The physical fitness of an athlete is often measured by how much oxygen the athlete takes in (which is recorded in milliliters per kilogram, ml/kg). the mean maximum oxygen uptake for elite athletes has been found to be 60 with a standard deviation of 7.2. assume that the distribution is approximately normal.
Answers: 3
question
Mathematics, 21.06.2019 15:30
Which answer is the solution set to the inequality |x|< 9? a. x< -9 or x> 9 b. x> -9 and x< 9 c. x> -9 or x< 9 d. x< 9 and x< 9
Answers: 1
question
Mathematics, 21.06.2019 16:30
Which statement about perfect cubes is true
Answers: 1
question
Mathematics, 21.06.2019 16:50
The parabola x = y² - 9 opens: a.)up b.)down c.) right d.)left
Answers: 1
You know the right answer?
In three hours, manufacturer z can make b ball bearings. manufacturer y can make b ball bearings in...
Questions
question
Mathematics, 29.01.2021 01:00
question
Mathematics, 29.01.2021 01:00
question
Mathematics, 29.01.2021 01:00
Questions on the website: 13722363