subject
Mathematics, 29.07.2019 06:30 JamierW2005

There are 1,000 workers in a a factory. each worker works 30 hours a week and is paid $10.50 an hour, how much does the company pay the workers altogether each week?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
The lengths of nails produced in a factory are normally distributed with a mean of 4.91 centimeters and a standard deviation of 0.05 centimeters. find the two lengths that separate the top 4% and the bottom 4%. these lengths could serve as limits used to identify which nails should be rejected. round your answer to the nearest hundredth, if necessary.
Answers: 3
question
Mathematics, 21.06.2019 18:00
How many triangles can be drawn with side lengths 4 centimeters, 4.5 centimeters, and 9 centimeters? explain
Answers: 1
question
Mathematics, 21.06.2019 20:30
On a cm grid, point p has coordinates (3,-1) and point q has coordinates (-5,6) calculate the shortest distance between p and q give your answer to 1 decimal place
Answers: 2
question
Mathematics, 22.06.2019 01:30
Which shaded region is the solution to the system of inequalities? y y[tex]\geq[/tex]-x+1
Answers: 3
You know the right answer?
There are 1,000 workers in a a factory. each worker works 30 hours a week and is paid $10.50 an hour...
Questions
Questions on the website: 13722367