This exercise illustrates that poor quality can affect schedules and costs. a manufacturing process has 70 customer orders to fill. each order requires one component part that is purchased from a supplier. however, typically, 2% of the components are identified as defective, and the components can be assumed to be independent. (a) if the manufacturer stocks 70 components, what is the probability that the 70 orders can be filled without reordering components? (b) if the manufacturer stocks 72 components, what is the probability that the 70 orders can be filled without reordering components? (c) if the manufacturer stocks 75 components, what is the probability that the 70 orders can be filled without reordering components?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 22:00
Find cot x if sin x cot x csc x = √2
Answers: 2
question
Mathematics, 22.06.2019 00:50
How does the graph of y = 3x compare to the graph of y = 3-x?
Answers: 1
question
Mathematics, 22.06.2019 03:00
Determine whether the question is a statistical question. explain. 1. what is the eye of sixth grade students? 2. at what temperature (in degree fahrenheit) does water freeze? 3. how many pages are in the favorite books of students your age? 4. how many hours do sixth grade students use the internet each week? you!
Answers: 3
question
Mathematics, 22.06.2019 03:00
He letter p on the number line below represents the number . (use the hyphen for negative numbers and write answer as a decimal, such as –7.2) number line from negative 7 to positive 7 in increments of 0.5 is shown. only the whole numbers are labeled. a point labeled p is placed at the eleventh tick mark to the left of 0.
Answers: 3
You know the right answer?
This exercise illustrates that poor quality can affect schedules and costs. a manufacturing process...