subject
Mathematics, 22.08.2019 08:00 keiolanibrooks

Amachine stamps 50 metal parts in 15 minutes 30 seconds. find the unit rate in parts per hour.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Acompany manufactures large valves, packed in boxes. a shipment consists of 1500 valves packed in 75 boxes. each box has the outer dimensions 1.2 x 0.8 x 1.6 m and the inner dimensions 1.19 x 0.79 x 1.59 m. the boxes are loaded on a vehicle (truck + trailer). the available capacity in the vehicle combination is 140 m3. each valve has a volume of 0.06 m3. - calculate the load factor on the box level (%). - calculate the load factor on the vehicle level (%). - calculate the overall load factor (%).
Answers: 1
question
Mathematics, 21.06.2019 19:30
When 142 is added to a number the result is 64 more then 3 times the number. option 35 37 39 41
Answers: 2
question
Mathematics, 21.06.2019 19:50
Which function has the domain x> -11
Answers: 1
question
Mathematics, 21.06.2019 23:40
What is the slope of (0,32) and (100,212)
Answers: 2
You know the right answer?
Amachine stamps 50 metal parts in 15 minutes 30 seconds. find the unit rate in parts per hour....
Questions
question
Chemistry, 19.02.2021 04:40
Questions on the website: 13722363