Answers: 1
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 23:00
Agroup of three friends order a combo meal which includes two slices of pizza and a drink each drink is priced at $2.50 the combined total of $31.50 how much is the cost of a slice of pizza
Answers: 2
Mathematics, 21.06.2019 23:30
Which two fractions are equivalent to 6/11? 6/22 and 18/33 12/22 and 18/33 12/22 and 18/22 3/5 and 6/10
Answers: 1
How much longer is a 1inch button than a 3/8 inch button...
Business, 16.01.2020 11:31
Mathematics, 16.01.2020 11:31
Health, 16.01.2020 11:31
Computers and Technology, 16.01.2020 11:31
Biology, 16.01.2020 11:31
Mathematics, 16.01.2020 11:31
Physics, 16.01.2020 11:31
Mathematics, 16.01.2020 11:31
Mathematics, 16.01.2020 11:31
Mathematics, 16.01.2020 11:31
Chemistry, 16.01.2020 11:31
Mathematics, 16.01.2020 11:31
Mathematics, 16.01.2020 11:31
Social Studies, 16.01.2020 11:31