subject
Mathematics, 12.03.2022 22:30 cbelew0001ouje4i

productivity can be measured in a variety of ways, such as by labor, capital, energy, material, usage, and so. at nodern lumber inc , art bintley, president and producer of apple gratea sold to grower, has been able, with his current equipment to produce 240 crates per 100 logs. he currently purchase 100 logs per day, and each log require 3 labor- hours to process. he believes that he can hire a professional buyers who can buy a better - quality log at the same cost. if this is the case, he can increase his product production to 260 crates per 100 logs. his labor- hour will increase by 8 hours a day. what will be impact on productivity ( measure in crates per labor "-hour)" if the buyer it hired?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
During a bike challenge riders have to collect various colored ribbons each 1/2 mile they collect a red ribbon each eighth mile they collect a green ribbon and each quarter mile they collect a blue ribbion wich colors of ribion will be collected at the 3/4 markrer
Answers: 3
question
Mathematics, 21.06.2019 17:40
What is the slope of the equation y =
Answers: 1
question
Mathematics, 21.06.2019 21:30
If you flip a coin 3 times, what is the probability of flipping heads 3 times? a. p(3 heads) = 3/8 b. p(3 heads) = 1/6 c. p(3 heads) = 1/8 d. p(3 heads) = 1/2
Answers: 2
question
Mathematics, 21.06.2019 22:20
Let f(x) = 5/x and g(x)=2x2+5x. what two numbers are not in the domain of f o g
Answers: 2
You know the right answer?
productivity can be measured in a variety of ways, such as by labor, capital, energy, material, usag...
Questions
question
Mathematics, 05.05.2020 06:52
question
History, 05.05.2020 06:52
question
Mathematics, 05.05.2020 06:52
Questions on the website: 13722367