subject
Mathematics, 17.01.2022 19:10 anadi8659

If 6 men finish a piece of work in 8 days, how long will it rake 4 men to

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Two times a number plus three times another number equals 4. three times the first number plus four times the other number is 7. find the numbers
Answers: 1
question
Mathematics, 21.06.2019 19:00
For what value of (y) is 3^3/3^y =1/9
Answers: 1
question
Mathematics, 22.06.2019 00:00
Apolygon is shown on the graph: a polygon is shown on the coordinate plane. vertices are located at 3 comma 5, 1 comma 3, 1 comma 1, 2 comma 0, 4 comma 0, 5 comma 1, and 5 comma 3. what effect will a translation 3 units down and 2 units left have on the polygon? be sure to address how it could impact the angles, side lengths, and congruency between the original pre-image and the image. xd i need
Answers: 3
question
Mathematics, 22.06.2019 00:00
Aclothing designer is selecting models to walk the runway for her fashion show. the clothes she designed require each model’s height to be no more than y inches from 5 feet 10 inches, or 70 inches. which graph could be used to determine the possible variance levels that would result in an acceptable height, x?
Answers: 2
You know the right answer?
If 6 men finish a piece of work in 8 days, how long will it rake 4 men to...
Questions
question
Social Studies, 11.10.2020 15:01
question
Mathematics, 11.10.2020 15:01
question
Mathematics, 11.10.2020 15:01
Questions on the website: 13722360