subject
Mathematics, 17.01.2022 01:00 FIRENINJA117

It takes 6 workers 8 hours to tile a hall . How long will it take 4 workers to complete the same job

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:02
Anew fountain in the shape of a hexagon will have 6 sides of equal length. on a scale drawing, the coordinates of the vertices of the fountain are: (7.5,5), (11.5,2), (7.5,−1), (2.5,−1), (−1.5,2), and (2.5,5). how long is each side of the fountain?
Answers: 3
question
Mathematics, 21.06.2019 17:20
Which system of linear inequalities is represented by the graph? + l tv x-3y > 6 and y > 2x o x + 3y > 6 and y o x-3y > 6 and y> 2x o x + 3y > 6 and y > 2x + 4 la +
Answers: 1
question
Mathematics, 21.06.2019 18:30
Ametal rod needs to be 9 feet and 5.5 inches in length. the sections of the poles being used are each 1 foot and 10.5 inches long. how many 1ft 10.5in sections would be needed to complete the 9ft 5.5in metal rod? and how many inches of material will be left?
Answers: 1
question
Mathematics, 21.06.2019 20:00
If cos(2x) = tan^2(y), show that cos(2y) = tan^2(x).
Answers: 3
You know the right answer?
It takes 6 workers 8 hours to tile a hall . How long will it take 4 workers to complete the same job...
Questions
question
Mathematics, 08.05.2021 05:00
question
English, 08.05.2021 05:00
Questions on the website: 13722363