A company is planning to manufacture snowboards. The fixed costs are $100 per day and total costs are $5500 per day at a daily output of 20 boards. The average cost per board for an output of x boards is given by (x)=C(x)/x. Find the average cost function.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:40
Find the value of x that will make l ll m
Answers: 2
question
Mathematics, 21.06.2019 18:30
Astuntman jumping off a 20-m-high building is modeled by the equation h=20-5t^2, where t is the same in seconds. a high-speed camera is ready to film him between 15m and 10m above the ground. for which interval of time should the camera film him?
Answers: 1
question
Mathematics, 21.06.2019 20:30
Ateam has p points. p = 3w + d w = wins d = draws a) a football team has 5 wins and 3 draws. how many points does the team have?
Answers: 1
question
Mathematics, 21.06.2019 23:50
What is the slope of the line that passes through the points (–9, 2) and (0, 4)? the slope of the line is
Answers: 2
You know the right answer?
A company is planning to manufacture snowboards. The fixed costs are $100 per day and total costs ar...
Questions
question
English, 16.10.2020 06:01
question
Mathematics, 16.10.2020 06:01
question
Spanish, 16.10.2020 06:01
question
Mathematics, 16.10.2020 06:01
question
Mathematics, 16.10.2020 06:01
Questions on the website: 13722363