subject
Mathematics, 14.12.2021 03:20 alexiasommers41

The construction engineer calculated that he needed 2 support pillars of equal size. He ordered 1/2 of a ton of concrete to make the support pillars. How much concrete did he use for each support pillar? 0) Writyyour answer as a fraction or as a whole or mixed number.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 21:00
Which spreadsheet would be used to compute the first nine terms of the geometric sequence a^n=32•(1/2)n-1
Answers: 3
question
Mathematics, 21.06.2019 23:30
Xy x xy if a and b are positive integers such that a*b=9 and b*a=72 what is the value of a/b
Answers: 3
question
Mathematics, 22.06.2019 00:10
Will mark the brainliest.paula makes stained-glass windows and sells them to boutique stores. if her costs total $12,000 per year plus $4 per window for the frame. how many windows must she produce to earn a profit of at least $48,000 in one year if she sells the windows for $28 each?
Answers: 1
question
Mathematics, 22.06.2019 00:10
What is the best estimate of the length of a football
Answers: 1
You know the right answer?
The construction engineer calculated that he needed 2 support pillars of equal size. He ordered 1/2...
Questions
question
Mathematics, 10.07.2019 00:00
question
Mathematics, 10.07.2019 00:00
Questions on the website: 13722360