subject
Mathematics, 06.12.2021 01:50 sarahelisabeth444

The diagram above shows a load that will be lifted using a lever. The distance from the tip of the fulcrum to the end of the board carrying the load is 5 m. The entire length of the board is 15 m. The end of the board where force will be applied is 3 m off the ground. How much work will be done if the load is raised as high as the lever can raise it, and the force used is 500 N? 497 N·m

167 N·m

1,500 N·m

3 N·m

The diagram is above please help quick above

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 23:30
Asinusoidal function whose frequency is 1/6pi
Answers: 2
question
Mathematics, 21.06.2019 23:30
Dots sells a total of 279 t-shirts ($2) and shorts ($4). in april total sales were $670. how many t-shirts and shorts did dots sell?
Answers: 1
question
Mathematics, 22.06.2019 03:00
You coordinate volunteers for litter cleanup in local parks. your spreadsheet lists drivers and the number of seat belts in each driver’s car. the spreadsheet calculates the number of drivers (d) and the total number of seat belts (s). you want to know the maximum number of volunteers, besides drivers, that can be transported to the park in a single trip given that each person must have a seat belt of their own.
Answers: 2
question
Mathematics, 22.06.2019 03:30
Consider the diagram. lines e and c can be described as
Answers: 3
You know the right answer?
The diagram above shows a load that will be lifted using a lever. The distance from the tip of the f...
Questions
question
History, 21.09.2019 13:10
Questions on the website: 13722367