subject
Mathematics, 29.11.2021 22:50 Arealbot

Foot. An Asphalt Mix is made up of several different aggregates and liquid asphalt. For the Asphalt
plant to produce the mix, the control computer needs to be set to equal the proper percentages
(by weight) of each material.
The Mix Design being used calls for the following aggregates.
Aggregate A = 8%
Aggregate B = 24%
Aggregate C= 25%
Aggregate D = 13%
Aggregate E = 30%
The mix Design also calls for 6.1% percent liquid asphalt to be added to the mix after the
aggregate has been blended together.
If the Asphalt Plant is going to produce 1056 tons of this mix, how many tons of each material is
needed?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:20
There are 4 cups in a quart and 4 quarts in a ganon.jug of water? . how many cups are in a 5-gallon jug of water?
Answers: 2
question
Mathematics, 21.06.2019 21:20
What is the area of a triangle with vertices at (-3 3) (-3,2) and (1,2)?
Answers: 1
question
Mathematics, 21.06.2019 22:20
Factor the polynomial. b^2 + 4b + 4
Answers: 2
question
Mathematics, 21.06.2019 23:00
The sum of 5consecutive even numbers is 100. what is the first number in this sequence?
Answers: 1
You know the right answer?
Foot. An Asphalt Mix is made up of several different aggregates and liquid asphalt. For the Asphal...
Questions
question
Advanced Placement (AP), 25.11.2020 07:20
question
Mathematics, 25.11.2020 07:20
question
Mathematics, 25.11.2020 07:20
question
English, 25.11.2020 07:30
question
Social Studies, 25.11.2020 07:30
Questions on the website: 13722367