subject
Mathematics, 24.11.2021 18:10 trejoste1

A company manufactures two products. Each unit of product X requires 10 machine hours and each unit of product Y requires 4 machine hours. The company's productive capacity is limited to $180,000 machine hours. Each unit of product X sells for $15 and has variable costs of $7. Each unit of product Y sells for $8 and has variable costs of $3. If the company can sell all that it produces of both products, what should the sales mix be? Please help me

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 22:40
Aclassmate thinks that solving a system by graphing gives an exact answer when the lines appear to cross at a grid point, but only an approximate answer when they don't. explain why this isn't true.
Answers: 3
question
Mathematics, 21.06.2019 23:30
The table shows the number of hours orlando spent at football practice last week. select the appropriate numbers below to complete the model to find the number of hours orlando spent practicing on tuesday and friday.
Answers: 2
question
Mathematics, 22.06.2019 01:40
At wind speeds above 1000 centimeters per second (cm/sec), significant sand-moving events begin to occur. wind speeds below 1000 cm/sec deposit sand and wind speeds above 1000 cm/sec move sand to new locations. the cyclic nature of wind and moving sand determines the shape and location of large dunes. at a test site, the prevailing direction of the wind did not change noticeably. however, the velocity did change. fifty-nine wind speed readings gave an average velocity of x = 1075 cm/sec. based on long-term experience, Οƒ can be assumed to be 245 cm/sec. (a) find a 95% confidence interval for the population mean wind speed at this site. (round your answers to the nearest whole number.) lower limit cm/sec upper limit cm/sec
Answers: 2
question
Mathematics, 22.06.2019 03:50
Leila is buying a dinosaur model. the price of the model is xxx dollars, and she also has to pay a 7\%7%7, percent tax.
Answers: 2
You know the right answer?
A company manufactures two products. Each unit of product X requires 10 machine hours and each unit...
Questions
Questions on the website: 13722363