Mathematics, 11.11.2021 14:00 vm204618
The cost to run Machine 1 for an hour is $2. During that
hour, Machine 1 produces 240 bolts and 100 nuts. The cost
to run Machine 2 for an hour is $2.40. During that hour,
Machine 2 produces 160 bolts and 160 nuts. With a combined
running time of no more than 30 hours, how long should
each machine run to produce an order of at least 2080 bolts
and 1520 nuts at the minimum operating cost?
this is applications of linear programming
Answers: 1
Mathematics, 21.06.2019 15:00
"princess tower" in dubai is considered the world's tallest residential building, towering to 1 0 1 101 floors! t ( n ) t(n) models the number of tenants living on floor n n of the tower. what does the statement t ( 2 0 ) = t ( c ) t(20)=t(c) mean?
Answers: 2
Mathematics, 22.06.2019 00:50
To diagonalize an nxn matrix a means to find an invertible matrix p and a diagonal matrix d such that a pdp d p ap or [1 3 dh epap 3 let a=-3 -5 -3 3 3 1 step 1: find the eigenvalues of matrix a "2's" step 2: find the corresponding eigenvectors of a step 3: createp from eigenvectors in step 2 step 4 create d with matching eigenvalues.
Answers: 3
Mathematics, 22.06.2019 01:30
The difference between the number of electoral votes for florida and north carolina is 12 votes. write and solve a subtraction equation to find a number of electoral votes for florida.
Answers: 3
Mathematics, 22.06.2019 03:00
If 0° ≤ θ ≤ 90° and cosθ = 11 15 , what is the value of sin (90° - θ)? a) 11 /15 b) 15/ 11 c) 15 /4 d) 4/15
Answers: 2
The cost to run Machine 1 for an hour is $2. During that
hour, Machine 1 produces 240 bolts and 10...
English, 10.04.2021 22:10
Mathematics, 10.04.2021 22:10
Mathematics, 10.04.2021 22:10
Chemistry, 10.04.2021 22:10
Biology, 10.04.2021 22:10