A special machine is used at a construction site to dig holes. A hole is dug to a depth of 4.75 feet when the machine hits rock. The progress slows to 3/5 feet per hour of digging. The depth of the hole must be at least 12 1/2 feet by the end of the day to stay on schedule.
What is the minimum amount of time the machine must continue at its present rate to complete the hole on schedule?
Select from the drop-down menus to correctly complete the statement.
The machine requires at least
Choose...
hours and
Choose...
minutes to complete the hole on schedule.
Answers: 2
Mathematics, 21.06.2019 18:30
Complex numbers multiply โ-4 * โ-25 and show all intermediate steps. alternative notation is sqrt(-4) * sqrt(-25).
Answers: 1
Mathematics, 21.06.2019 19:00
The ratio of the measures of the three angles in a triangle is 2: 9: 4. find the measures of the angels
Answers: 2
Mathematics, 21.06.2019 19:30
[15 points]find the least common multiple of the expressions: 1. 3x^2, 6x - 18 2. 5x, 5x(x +2) 3. x^2 - 9, x + 3 4. x^2 - 3x - 10, x + 2 explain if possible
Answers: 3
A special machine is used at a construction site to dig holes. A hole is dug to a depth of 4.75 feet...
Biology, 11.03.2020 00:03
Mathematics, 11.03.2020 00:03
English, 11.03.2020 00:03
Mathematics, 11.03.2020 00:03
English, 11.03.2020 00:03
Mathematics, 11.03.2020 00:03
History, 11.03.2020 00:03
History, 11.03.2020 00:03