158 ft.
An engineering company was hired to dig an underground tunnel directly from
po...
Mathematics, 19.10.2021 03:10 mdlnlcs
158 ft.
An engineering company was hired to dig an underground tunnel directly from
point A to point B, which was a distance of 1.4 miles. By mistake, however, they
tunneled from point A to point C. Then they tunneled from point C to point B. If
tunneling costs about $120 million per mile, about how much money was wasted?
Show how you found your answer. (Note: 1 mile = 5,280 feet)
Answers: 3
Mathematics, 21.06.2019 23:00
72 the length of a side of a triangle is 36. a line parallel to that side divides the triangle into two parts of equal area. find the length of the segment determined by the points of intersection between the line and the other two sides of the triangle.
Answers: 1
Mathematics, 21.06.2019 23:00
Evaluate the function , when d = {9, 15, 30}. r = {5, 7, 12} r = {6, 10, 15} r = {6, 10, 20} r = {5, 12, 20}
Answers: 2
Mathematics, 22.06.2019 00:20
The circle below is centered at the point (3, 1) and has a radius of length 2. what is the equation?
Answers: 1
Mathematics, 14.12.2020 21:00
Mathematics, 14.12.2020 21:00
Mathematics, 14.12.2020 21:00
Computers and Technology, 14.12.2020 21:00
Mathematics, 14.12.2020 21:00
English, 14.12.2020 21:00
Mathematics, 14.12.2020 21:00
Mathematics, 14.12.2020 21:00