158 ft. An engineering company was hired to dig an underground tunnel directly from

point A to point B, which was a distance of 1.4 miles. By mistake, however, they

tunneled from point A to point C. Then they tunneled from point C to point B. If

tunneling costs about $120 million per mile, about how much money was wasted?

Show how you found your answer. (Note: 1 mile = 5,280 feet)

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 23:00
72 the length of a side of a triangle is 36. a line parallel to that side divides the triangle into two parts of equal area. find the length of the segment determined by the points of intersection between the line and the other two sides of the triangle.
Answers: 1
question
Mathematics, 21.06.2019 23:00
Divide. –4.2 ÷ 6 = a –0.7 b 0.7 c –7 d 7 me
Answers: 2
question
Mathematics, 21.06.2019 23:00
Evaluate the function , when d = {9, 15, 30}. r = {5, 7, 12} r = {6, 10, 15} r = {6, 10, 20} r = {5, 12, 20}
Answers: 2
question
Mathematics, 22.06.2019 00:20
The circle below is centered at the point (3, 1) and has a radius of length 2. what is the equation?
Answers: 1
You know the right answer?
158 ft. An engineering company was hired to dig an underground tunnel directly from

po...
Questions
question
Mathematics, 14.12.2020 21:00
question
Mathematics, 14.12.2020 21:00
question
Mathematics, 14.12.2020 21:00
question
Mathematics, 14.12.2020 21:00
Questions on the website: 13722363