subject
Mathematics, 28.09.2021 23:00 TVASALLO31

A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant il needs at least 32 engines. The company can send at most 120 engines to these assembly plants. It costs $35 per engine to ship to plant I and $50 per engine to ship to plant II. Plant loves the manufacturing company 820 in rebates toward is products for each engine they buy, while plant Il gives similar S15 rebates. The manufacturer estimates that they
need at least $1500 in rebates to cover products they plan to buy from the two plants. How many engines should be shipped to each plant to minimize shipping costs? What is the minimum cost?
How many engines should be shipped to each plant to minimize shipping costs, subject to the given constraints?
The number of engines to send to plant I is ___?
The number of engines to send to plant II is __?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:50
For f(x)=2x+1 and g(x)= x^2 -7, find (f•g)(x)
Answers: 1
question
Mathematics, 21.06.2019 15:00
What is the multiplicative rate of change of the exponential function shown on the graph?
Answers: 2
question
Mathematics, 22.06.2019 00:00
Triangles abc and dfg are given. find the lengths of all other sides of these triangles if: b ∠a≅∠d, ab·dg=ac·df, ac=7 cm, bc=15 cm, fg=20 cm, and df-ab=3 cm.
Answers: 1
question
Mathematics, 22.06.2019 03:00
Franklin is purchasing a home for $82,107 and is financing 80% of it. the documentary stamp tax on the deed in his state is $0.70 per $100 or portion thereof. how much will he pay for the documentary stamp tax?
Answers: 2
You know the right answer?
A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least...
Questions
question
Mathematics, 12.12.2020 17:00
question
Chemistry, 12.12.2020 17:00
Questions on the website: 13722363