subject
Mathematics, 26.09.2021 23:30 angelgarcia12379

9 men pave x% of a road in 4 hours. Given that all the men work at the same rate, find how long it takes for 6 men to pave x% of the road

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
The perimeter of a triangle is 69 cm. the first is 5 cm shorter than the second side. the third side is twice as long the first side. find the length of each side
Answers: 1
question
Mathematics, 21.06.2019 17:30
25 ! the line of best fit is h = 5a + 86. predict the height at age 16.
Answers: 2
question
Mathematics, 21.06.2019 19:00
Since opening night, attendance at play a has increased steadily, while attendance at play b first rose and then fell. equations modeling the daily attendance y at each play are shown below, where x is the number of days since opening night. on what day(s) was the attendance the same at both plays? what was the attendance? play a: y = 8x + 191 play b: y = -x^2 + 26x + 126 a. the attendance was never the same at both plays. b. the attendance was the same on day 5. the attendance was 231 at both plays on that day. c. the attendance was the same on day 13. the attendance was 295 at both plays on that day. d. the attendance was the same on days 5 and 13. the attendance at both plays on those days was 231 and 295 respectively.
Answers: 1
question
Mathematics, 21.06.2019 22:50
He graph of f(x) = |x| is stretched by a factor of 0.3 and translated down 4 units. which statement about the domain and range of each function is correct? the range of the transformed function and the parent function are both all real numbers greater than or equal to 4. the domain of the transformed function is all real numbers and is, therefore, different from that of the parent function. the range of the transformed function is all real numbers greater than or equal to 0 and is, therefore, different from that of the parent function. the domain of the transformed function and the parent function are both all real numbers.
Answers: 3
You know the right answer?
9 men pave x% of a road in 4 hours. Given that all the men work at the same rate, find how long it...
Questions
question
Mathematics, 01.01.2020 06:31
question
Mathematics, 01.01.2020 06:31
question
Mathematics, 01.01.2020 06:31
Questions on the website: 13722361