subject
Mathematics, 22.09.2021 14:00 maybe67

A company that produces pleasure boats has decided to expand one of its lines. Current facilities are insufficient to handle the increased workload, so the company is considering three alternatives, A (new location), B (subcontract), and C (expand existing facilities). Alternative A would involve substantial fixed costs but relatively low variable costs: fixed costs would be $260,000 per year, and variable costs would be $510 per boat. Subcontracting would involve a cost per boat of $2,620, and expansion would require an annual fixed cost of $60,000 and a variable cost of $1,010 per boat.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:50
3-12. write each answer with a reasonable number of figures. find the absolute uncertainty and percent relative uncertainty for each answer. (a) [12.41 (±0.09) + 4.16 (±0.01)] x 7.068 2 (±0.000 4) =? (b) [3.26 (±0.10) x 8.47 (±0.05)] - 0.18 (±0.06) =? (c) 6.843 (±0.008) x 104 + [2.09 (±0.04)- 1.63 (±0.01)] =?
Answers: 1
question
Mathematics, 21.06.2019 17:30
17 in long 1.3 ft wide and 8in high what is the volume
Answers: 1
question
Mathematics, 21.06.2019 18:00
Give all possible names for the line shown.calculation tip: lines can be written with either point first.
Answers: 1
question
Mathematics, 21.06.2019 20:00
The two square pyramids are similar. find the total volume of both pyramids if the ratio of their surface areas is 9/16
Answers: 3
You know the right answer?
A company that produces pleasure boats has decided to expand one of its lines. Current facilities ar...
Questions
question
Mathematics, 11.11.2020 01:00
question
Physics, 11.11.2020 01:00
question
Mathematics, 11.11.2020 01:00
question
Social Studies, 11.11.2020 01:00
Questions on the website: 13722360