A project consists of five activities. Naturally the paint mixing precedes the painting activities. Also, both ceiling painting and floor sanding must be done prior to floor buffing. Optimistic Most Probable Pessimistic Activity Time (hr) Time (hr) Time (hr) Floor sanding 3 4 5 Floor buffing 1 2 3 Paint mixing 0.5 1 1.5 Wall painting 1 2 9 Ceiling painting 1 5.5 7 ​ Construct the PERT/CPM network for this problem on a rough paper. What is the expected completion time of this project? What is the probability that the project can be completed within 9 hr.?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
Three times the sum of a number and seven is negative thirty-six. what is the number?
Answers: 2
question
Mathematics, 22.06.2019 00:10
If sr is 4.5cm and tr is 3cm, what is the measure in degrees of angle s? a. 56.3 b. 33.7 c. 41.8 d. 48.2
Answers: 3
question
Mathematics, 22.06.2019 01:00
In a newspaper, it was reported that yearly robberies in springfield were up 25% to 265 in 2013 from 2012. how many robberies were there in springfield in 2012?
Answers: 2
question
Mathematics, 22.06.2019 02:30
The price of a visit to the dentist is \$50$50. if the dentist fills any cavities, an additional charge of \$100$100 per cavity gets added to the bill. if the dentist finds nn cavities, what will the cost of the visit be?
Answers: 2
You know the right answer?
A project consists of five activities. Naturally the paint mixing precedes the painting activities....
Questions
question
Mathematics, 23.10.2020 22:10
question
Business, 23.10.2020 22:10
question
Mathematics, 23.10.2020 22:10
question
Mathematics, 23.10.2020 22:10
Questions on the website: 13722367