subject
Mathematics, 03.09.2021 19:20 theresamarieuehling2

A company manufactures an assembly consisting of a frame, a shaft, and a ball bearing. The company manufactures the shafts and frames but purchases the ball bearings from a ball bearing manufacturer. Each shaft must be processed on a forging machine, a lathe, and a grinder. These operations require 0.6 hour, 0.3 hour, and 0.4 hours per shaft, respectively. Each frame requires 0.8 hours on a forging machine, 0.1 hours on a drilling machine, 0.3 hours on a milling machine, and 0.5 hours on a grinder. The company has 5 lathes, 10 grinders, 20 forging machines, 3 drillers, and 6 illers. Assume that each machine operates a maximum of 2400 hours per year. Required:
Formulate the problem of finding the maximum number of assembled components that can be produced as a linear program.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Which point is on the line y=-2+3? (-2,-1) (3,3) (3,-3) (-3,-9)
Answers: 2
question
Mathematics, 21.06.2019 15:00
What is the value of the expression below? (81^2)^1/8
Answers: 1
question
Mathematics, 21.06.2019 22:30
The median for the given set of six ordered data values is 29.5 9 12 25 __ 41 48 what is the missing value?
Answers: 1
question
Mathematics, 21.06.2019 23:30
The bottom of ignacio's desktop is 74.5cm from the floor. ignacios sits in his adjustable chair, and the tops of his legs are 49.3cm from the floor. each clockwise rotation of the knob on the chair raises ignacio's legs by 4.8cm. write an inequality to determine the number of clockwise rotations, r, ignacio could make with the knob without his legs touching the desk.
Answers: 3
You know the right answer?
A company manufactures an assembly consisting of a frame, a shaft, and a ball bearing. The company m...
Questions
question
Health, 31.12.2020 19:30
question
Mathematics, 31.12.2020 19:30
Questions on the website: 13722367