Mathematics, 03.09.2021 01:00 alexis24852
5. Four workers are repairing a bridge at
these distances from the roadway.
Worker 1: 7 feet below the roadway
Worker 2: 13 feet above the roadway
Worker 3: 13 feet below the roadway
Worker 4: at the roadway
Which shows the distances in order from
highest and lowest?
A 0, -7, 13, -13 C 13, 0, -13, -7
B 13, -13, -7,0 D 13, 0, -7, -13
Answers: 1
Mathematics, 21.06.2019 19:00
In the figure below, ∠dec ≅ ∠dce, ∠b ≅ ∠f, and segment df is congruent to segment bd. point c is the point of intersection between segment ag and segment bd, while point e is the point of intersection between segment ag and segment df. the figure shows a polygon comprised of three triangles, abc, dec, and gfe. prove δabc ≅ δgfe.
Answers: 1
Mathematics, 21.06.2019 21:30
Due to bad planning, two of the local schools have their annual plays on the same weekend. while 457 people attend one, and 372 attend the other, only 104 people were able to attend both. how many people went to at least one play?
Answers: 1
Mathematics, 21.06.2019 23:30
Identify the slope an intercept of the following linear equation y = 1/5x - 6 a. slope: 1/5; intercept: -6 b. slope: 5; intercept: -6 c. slope: -1/5; intercept: 6 d. slope: 1/5; intercept: 6
Answers: 2
Mathematics, 22.06.2019 05:30
Two spray paint machines are used to paint different portions of a large wall. the first machine (nicknamed "paint pro") is used for two hours. the second machine (nicknamed "goldilocks") is used for an hour and a half. when they are working at the same time, they can paint 55 square feet per minute. together they painted 5850 square feet of wall. how many square feet of wall per minute can each machine paint? e used to paint different portions of a large wall. the first machine (nicknamed "paint pro") is used for two hours. the second machine (nicknamed "goldilocks") is used for an hour and a half. when they are working at the same time, they can paint 55 square feet per minute. together they painted 5850 square feet of wall. how many square feet of wall per minute can each machine paint?
Answers: 3
5. Four workers are repairing a bridge at
these distances from the roadway.
Worker 1: 7 feet...
Worker 1: 7 feet...
Engineering, 19.01.2021 14:00
Mathematics, 19.01.2021 14:00
Chemistry, 19.01.2021 14:00
Mathematics, 19.01.2021 14:00
Health, 19.01.2021 14:00
Chemistry, 19.01.2021 14:00
Mathematics, 19.01.2021 14:00
Mathematics, 19.01.2021 14:00
Mathematics, 19.01.2021 14:00
History, 19.01.2021 14:00
Social Studies, 19.01.2021 14:00
Mathematics, 19.01.2021 14:00
Mathematics, 19.01.2021 14:00
World Languages, 19.01.2021 14:00