subject
Mathematics, 02.09.2021 07:40 rileyeddins1010

The new Xerox machine working alone can complete a job in 20 minutes. To do the same job it would take the old Xerox machine 50 minutes. How long would it take them to complete the job if
they worked together?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 21:00
Choose the equation that represents the graph below: (1 point) graph of a line passing through points negative 3 comma 0 and 0 comma 3 y = x − 3 y = −x + 3 y = −x − 3 y = x + 3 will award !
Answers: 3
question
Mathematics, 21.06.2019 22:30
Solve: 25 points find the fifth term of an increasing geometric progression if the first term is equal to 7−3 √5 and each term (starting with the second) is equal to the difference of the term following it and the term preceding it.
Answers: 1
question
Mathematics, 22.06.2019 00:00
What is the area of the shaded sector?
Answers: 2
question
Mathematics, 22.06.2019 02:30
Find the product. type your answer in the space provided. use / for a fraction bar (example: 1/2) and ^ for an exponent (example: x^5). do not put spaces in your answer. (x -1 y 5)^2 · (2xy -2)^5
Answers: 1
You know the right answer?
The new Xerox machine working alone can complete a job in 20 minutes. To do the same job it would...
Questions
question
Social Studies, 12.12.2019 09:31
question
Mathematics, 12.12.2019 09:31
Questions on the website: 13722363