subject
Mathematics, 01.09.2021 20:00 princess239

A building contractor is to dig a foundation 42 feet​ long, 21 feet​ wide, and 9 feet deep. The contractor pays ​$10 per load for trucks to remove the dirt. Each truck holds 7 cubic yards. What is the cost to the contractor to have all the dirt hauled​ away?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
Vinay constructed this spinner based on the population of teachers at his school according to vinays model what is the probability that he will have a male history teacher two years in a row
Answers: 3
question
Mathematics, 21.06.2019 22:00
Need showing work for this problem 56.25 ×25.80
Answers: 1
question
Mathematics, 21.06.2019 23:30
Apyramid fits exactly inside a cube. the cube and the pyramid share the same square base, and they are both exactly the same height. the volume of the cube is 66 cubic inches. what is the volume of the pyramid? explain your answer. answer asap
Answers: 1
question
Mathematics, 22.06.2019 00:00
Which of the following is the maximum value of the equation y=-x^2+2x+5 a. 5 b. 6 c. 2. d. 1
Answers: 1
You know the right answer?
A building contractor is to dig a foundation 42 feet​ long, 21 feet​ wide, and 9 feet deep. The cont...
Questions
question
English, 13.10.2020 15:01
question
Arts, 13.10.2020 15:01
Questions on the website: 13722363