subject
Mathematics, 24.08.2021 05:30 gujaratif932

You are about to begin work on a swimming pool in your yard. The first step is to have a hole dug that is 30 feet long, 18 feet wide, and 6 feet deep. You will use a truck that can carry 20 cubic yards of dirt and charges
$30 per load. How much will it cost you to have all the dirt hauled away?
The cost is $

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
How many triangles can be drawn with side lengths 4 centimeters, 4.5 centimeters, and 9 centimeters? explain
Answers: 1
question
Mathematics, 21.06.2019 19:00
What are the solutions of the system? y = x^2 + 2x +3y = 4x - 2a. (-1, -6) and (-3, -14)b. (-1, 10) and (3, -6)c. no solutiond. (-1, -6) and (3, 10)
Answers: 1
question
Mathematics, 21.06.2019 20:30
At the "no mutants allowed" country farm, every sheep has 4 legs, every chicken has two legs, and all animals have only 1 head. asked to count how many sheep and chicken are in the fields, a farm boy reports back that there are 140 feet and 50 heads. how many sheep and chicken are there? there are sheep and chicken at the farm.
Answers: 1
question
Mathematics, 22.06.2019 00:30
Three friends are comparing the prices of various packages of golf balls at a sporting goods store. hector finds a package of 6 golf balls that costs $4.50.
Answers: 3
You know the right answer?
You are about to begin work on a swimming pool in your yard. The first step is to have a hole dug th...
Questions
Questions on the website: 13722360