subject
Mathematics, 21.08.2021 06:00 allieb12334

Question 1 A factory has to transport raw materials to a project site. The total weight of the raw material will not be less than 1,500 tons. The factory manager plans
to use two different trucking firms, Big Red has heavy duty trucks that can transport 200 tons at a cost of $50 per truckload. Common Joe is a more
economical firm, costing only $20 per load, but its trucks can transport only 90 tons. The factory manager does not wish to spend more than $450 on
transportation. The availability of trucks is the same for both firms.
Part A
What inequality will show the number of trucks used to transport the required raw material? Replace the inequality sign with the equal sign. Go to
your math tools and open the Graph tool to graph the resulting equation and paste it into the box below. Describe which part of the graph should
be shaded and whether the line should be dashed or not.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:50
Do 12/14 and 8/10 have the same value? explain your answer.
Answers: 1
question
Mathematics, 21.06.2019 18:10
Jordan has $5.37, which he is using to buy ingredients to make salsa. he is buying one red pepper for $1.29 and three pounds of tomatoes. if jordan has exactly the right amount of money he needs, what is the price per pound of the tomatoes? choose the correct equation to represent this real-world problem. solve the equation and verify the reasonableness of your answer. a pound of tomatoes costs .
Answers: 1
question
Mathematics, 21.06.2019 20:50
An automobile assembly line operation has a scheduled mean completion time, μ, of 12 minutes. the standard deviation of completion times is 1.6 minutes. it is claimed that, under new management, the mean completion time has decreased. to test this claim, a random sample of 33 completion times under new management was taken. the sample had a mean of 11.2 minutes. assume that the population is normally distributed. can we support, at the 0.05 level of significance, the claim that the mean completion time has decreased under new management? assume that the standard deviation of completion times has not changed.
Answers: 3
question
Mathematics, 21.06.2019 21:30
What is r i 4.5+10r=-6.5 with work pls
Answers: 1
You know the right answer?
Question 1 A factory has to transport raw materials to a project site. The total weight of the raw...
Questions
question
English, 03.11.2020 07:40
question
Spanish, 03.11.2020 07:40
question
Mathematics, 03.11.2020 07:40
Questions on the website: 13722361