subject
Mathematics, 18.08.2021 16:20 davidaagurto

A construction worker can install 2 windows in 4 of a day. When setting up the schedule, the worker determines that he can install 1 of a window per day. What was the worker's error?
* The worker multiplied 2 by instead of dividing 2 by
O The worker divided 1 by 2 instead of dividing 2 by
O The worker subtracted from 2 instead of dividing 4 by 2.
O The worker divided 2 by instead of subtracting 4 from 2.
• The worker divided 2 by 1 instead of dividing 1 by 2.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:10
What is the point-slope equation of a line with slope -5 that contains the point (6,3)
Answers: 1
question
Mathematics, 21.06.2019 16:20
Giuseppi's pizza had orders for $931.00 of pizzas. the prices were $21 for a large pizza, 514 for a medium pizza, and $7 for a small pizza. the number of large pizzas was two less than four times the number of medium pizzas. thenumber of small pizzas was three more than three times the number of medium pizzas. how many of each size of pizza were ordered?
Answers: 1
question
Mathematics, 21.06.2019 17:00
Find an equation for the linear function which has slope -10 and x-intercept -7
Answers: 1
question
Mathematics, 21.06.2019 21:00
What number line represents the solution set for the inequality -1/2 greater than or equal to 4
Answers: 1
You know the right answer?
A construction worker can install 2 windows in 4 of a day. When setting up the schedule, the worker...
Questions
question
Biology, 24.09.2021 07:50
question
Social Studies, 24.09.2021 07:50
question
French, 24.09.2021 07:50
Questions on the website: 13722367