subject
Mathematics, 17.08.2021 03:40 adamskhan990

The quality engineer in charge of a salt packaging process is concerned about the moisture content in packages of salt. The primary concern is that variation in the ambient humidity in the plant may be causing variation in the mean moisture content in the packages over time. It is decided that packages in each sample will be produced as close to each other in time as possible. In this way, the ambient humidity will be nearly the same for each package in the sample so that the within-group variation will not be affected by this special cause. Five packages of salt are sampled every 15 minutes for 5 hours and the moisture content in each package is measured as a percentage of total weight. The data is found below. Sample Sample Values
1 2.53 2.66 1.88 2.21 2.26
2 2.69 2.38 2.34 2.47 2.61
3 2.67 2.23 2.10 2.43 2.54
4 2.10 2.26 2.51 2.58 2.28
5 2.64 2.42 2.56 2.51 2.36
6 2.64 1.63 2.95 2.12 2.67
7 2.58 2.69 3.01 3.01 2.23
8 2.31 2.39 2.60 2.40 2.46
9 3.03 2.68 2.27 2.54 2.63
10 2.86 3.22 2.72 3.09 2.48
11 2.71 2.80 3.09 2.60 3.39
12 2.95 3.54 2.59 3.31 2.87
13 3.14 2.84 3.77 2.27 3.22
14 2.85 3.29 3.25 3.35 3.59
15 2.82 3.71 3.36 2.95 3.37
16 3.17 3.07 3.14 3.63 3.70
17 2.81 3.21 2.95 3.04 2.85
18 2.99 2.65 2.79 2.80 2.95
19 3.11 2.74 2.59 3.01 3.03
20 2.83 2.74 3.03 2.68 2.49
The quality engineer is trying to establish the control limits for an X bar and R chart. Using the data, compute the centerline and control limits for an R chart. Plot the points. Is the process in statistical control?
If the chart is out-of-control, assume that the assignable cause is found and corrected. Eliminate the out-of-control point(s), recompute the limits and redraw the R chart. Does the process appear to be in control now? If the chart is in control, skip to part (c).
Compute the centerline and limits for and draw the X bar chart (Note: do not include any eliminated points from part (b)). Does the process mean appear to be in control?
Outline the remaining steps in this process to establish the control limits (do not carry them out).
Assume the process is in control with the following values: For the X bar chart, the centerline = 2.704 with UCL=3.060 and LCL=2.348. For the R chart, the centerline = 0.6164 with UCL = 1.33 and LCL = 0. Estimate the mean and standard deviation for this process.
If the specifications for moisture content are [1.80, 3.70], estimate the fraction nonconforming packages of salt (in ppm).
Estimate Cp and Cpk. Comment on their results.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 12:50
Which logarithmic equation is equivalent to the exponential equation below? e^a=55(you will receive 34 points)
Answers: 1
question
Mathematics, 21.06.2019 16:00
Find the amount in a continuously compounded account for the given condition. principal: $1000, annual interest rate: 4.8%, time: 2 yr
Answers: 3
question
Mathematics, 21.06.2019 16:20
Abby is preparing fruit punch for her party. she starts with a bowl filled with liquid that has 1/2 fruit juice and 1/2 sprite, but she decides it's too fruity. so she pours out 1/4 of the liquid, and then fills the bowl up again with sprite. what fraction of the punch is now sprite?
Answers: 1
question
Mathematics, 21.06.2019 16:20
Aclass consists of 55% boys and 45% girls. it is observed that 25% of the class are boys and scored an a on the test, and 35% of the class are girls and scored an a on the test. if a student is chosen at random and is found to be a girl, the probability that the student scored an ais
Answers: 2
You know the right answer?
The quality engineer in charge of a salt packaging process is concerned about the moisture content i...
Questions
question
Mathematics, 13.09.2020 20:01
question
Mathematics, 13.09.2020 20:01
question
Mathematics, 13.09.2020 20:01
question
Chemistry, 13.09.2020 20:01
question
Mathematics, 13.09.2020 20:01
question
Mathematics, 13.09.2020 20:01
question
Mathematics, 13.09.2020 20:01
question
Mathematics, 13.09.2020 20:01
question
Mathematics, 13.09.2020 20:01
question
Mathematics, 13.09.2020 20:01
question
English, 13.09.2020 20:01
question
Mathematics, 13.09.2020 20:01
question
Social Studies, 13.09.2020 20:01
question
English, 13.09.2020 20:01
question
Mathematics, 13.09.2020 20:01
question
Mathematics, 13.09.2020 20:01
question
Mathematics, 13.09.2020 20:01
question
Spanish, 13.09.2020 20:01
question
Mathematics, 13.09.2020 20:01
question
Mathematics, 13.09.2020 20:01
Questions on the website: 13722367