Mathematics, 04.08.2021 14:00 jessicajamah3289
The estimated project completion times ( days) for the Safaricom PLC Marketing research Assignment problem is as follows;
REGION
PROJECT LEADER 1 2 3
Muthoni 10 15 9
Oduor 9 18 5
Toroitich 6 14 3
Required:
Draw a network model for the project
Develop the objective function
Conduct an optimal assignment of the three project leaders to the three regions using the Hungarian approach.
Comment on the results
Answers: 1
Mathematics, 21.06.2019 20:30
Steve had 48 chocolates but he decided to give 8 chocolats to each of his f coworkers. how many chocolates does steve have left
Answers: 1
Mathematics, 21.06.2019 21:00
When solving this problem: 3025/5.5 = a/90.75 you get 49912.5 which would be the length of one of the sides of a square when the area is only 90.75 inches. is that answer correct, why, and how is it possible?
Answers: 1
Mathematics, 21.06.2019 23:30
The area (a) of a circle with a radius of r is given by the formula and its diameter (d) is given by d=2r. arrange the equations in the correct sequence to rewrite the formula for diameter in terms of the area of the circle.
Answers: 1
The estimated project completion times ( days) for the Safaricom PLC Marketing research Assignment p...
Computers and Technology, 13.08.2020 22:01
Mathematics, 13.08.2020 22:01
History, 13.08.2020 22:01