MIT EMRA TU DRED
COURSE
OUTCOMES & EVENTS
Initial assessment
An antibody test...
Mathematics, 03.08.2021 07:00 Jaylen52709
MIT EMRA TU DRED
COURSE
OUTCOMES & EVENTS
Initial assessment
An antibody test for a virus has a false positive rate of 598 (if you haven't had the virus it
will say you did 5% of the time) and a false negative rate of 0% (it will always correctly
identify if you had the virus). 1% of the population has had the virus If you tested
positive, what is the probability you had the virus? State answer to 3 significant digits
Answers: 2
Mathematics, 21.06.2019 14:00
Which expression is equivalent to? assume x > 0 and y > 0.
Answers: 1
Mathematics, 21.06.2019 14:50
On a piece of paper, graph . then determine which answer choice matches the graph you drew
Answers: 1
Mathematics, 21.06.2019 15:00
Alake near the arctic circle is covered by a 222-meter-thick sheet of ice during the cold winter months. when spring arrives, the warm air gradually melts the ice, causing its thickness to decrease at a constant rate. after 333 weeks, the sheet is only 1.251.251, point, 25 meters thick. let s(t)s(t)s, left parenthesis, t, right parenthesis denote the ice sheet's thickness sss (measured in meters) as a function of time ttt (measured in weeks).
Answers: 1
Mathematics, 21.06.2019 19:00
What numbers are included in the set of integers? what numbers are not included?
Answers: 2
Mathematics, 06.11.2020 02:20
Mathematics, 06.11.2020 02:20
Chemistry, 06.11.2020 02:20
Mathematics, 06.11.2020 02:20
Advanced Placement (AP), 06.11.2020 02:20
History, 06.11.2020 02:20
Arts, 06.11.2020 02:20
Biology, 06.11.2020 02:20
History, 06.11.2020 02:20
Mathematics, 06.11.2020 02:20