You make wings for drones using Kanban cards to authorize movement of incoming parts. In one portion of the system, a work center uses an average of 93 parts per hour while running. The manager has assigned an inefficiency factor of 0.12 to the center. Standard containers are designed to hold 5 dozen parts each. The cycle time for parts containers is 65 minutes. How many containers are needed

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Abag contains 3 red marbles 4 white marbles and 5 blue marbles if one marble is drawn from the bag what is the probability that the marble will be blue
Answers: 1
question
Mathematics, 21.06.2019 17:20
Consider the proof. given: segment ab is parallel to line de. prove: what is the missing statement in step 5?
Answers: 3
question
Mathematics, 21.06.2019 20:00
15 there is a line that includes the point 0,10 and has a slope of 7/4. what is it’s equation in slope intercept form
Answers: 1
question
Mathematics, 21.06.2019 20:30
The areas of two similar triangles are 72dm2 and 50dm2. the sum of their perimeters is 226dm. what is the perimeter of each of these triangles?
Answers: 1
You know the right answer?
You make wings for drones using Kanban cards to authorize movement of incoming parts. In one portion...
Questions
question
Mathematics, 26.03.2020 00:57
question
Mathematics, 26.03.2020 00:57
Questions on the website: 13722367