subject
Mathematics, 28.07.2021 17:50 sidney2602

A quality control engineer at a potato chip company tests the bag filling machine by weighing bags of potato chips. Not every bag contains exactly the same weight. But if more than 16% of bags are over-filled then they stop production to fix the machine. They define over-filled to be more than 1 ounce above the weight on the package. The engineer weighs 94 bags and finds that 16 of them are over-filled. He plans to test the hypotheses H 0 : p = 0.11 versus H a : p > 0.11. What is the test statistic?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Read the following two statements. then use the law of syllogism to draw a conclusion. if the tv is too loud, then it will give me a headache. if i have a headache, then i will have to rest.
Answers: 2
question
Mathematics, 21.06.2019 17:30
Jabari is power washing houses for a summer job. for every job, he charges an initial fee plus $30 for each hour of work. his total fee for a 4 -hour job, for instance, is $170 . jabari's total fee,f, for a single job is a function of the number,t, of hours it takes him to complete the job. write the function's formula.
Answers: 2
question
Mathematics, 21.06.2019 18:30
Angela took a general public aptitude test and scored in the 88th percentile for aptitude in accounting. what percentage of the scores were at or below her score?
Answers: 2
question
Mathematics, 21.06.2019 20:00
Select the number of ways in which a line and a circle can intersect
Answers: 3
You know the right answer?
A quality control engineer at a potato chip company tests the bag filling machine by weighing bags o...
Questions
question
Mathematics, 04.12.2019 01:31
question
Mathematics, 04.12.2019 01:31
question
Social Studies, 04.12.2019 01:31
Questions on the website: 13722367