subject
Mathematics, 20.07.2021 04:10 hartzpeyton136

A construction crane lifts a bucket of sand originally weighing 145 lbs at a constant rate. Sand is lost from the bucket at a constant rate of .5lbs/ft. How much work is done in lifting the sand 80ft?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Which number is irrational? a) 16 b) 18 c) 25 d) 36
Answers: 2
question
Mathematics, 21.06.2019 18:00
Aplane is taking off from bangladesh headed to new york city. at the same time, a plane from new york city is headed to bangladesh is also taking off. the plane bound to new york city is traveling at 600 mph, while the plane traveling to bangladesh is traveling at 400 mph. how far from new york city will the two planes meet if the distance between new york city and bangladesh is 8,000 miles?
Answers: 3
question
Mathematics, 21.06.2019 18:00
What is the value of x in the equation 2(x-4) = 4(2x + 1)?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Given: m∠ adb = m∠cdb ad ≅ dc prove: m∠ bac = m∠bca lol
Answers: 2
You know the right answer?
A construction crane lifts a bucket of sand originally weighing 145 lbs at a constant rate. Sand is...
Questions
Questions on the website: 13722363