subject
Mathematics, 20.07.2021 01:00 shermaine17

Paul can install a 300-square-foot hardwood floor in 18 hours. Matt can install the same floor in 22 hours. How long would it take Paul and Matt to install the floor working together? 4 hours
9.9 hours
13.2 hours
30 hours

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 22:30
Solve for x. −3/4(x+2)=6 enter your answer in the box
Answers: 1
question
Mathematics, 22.06.2019 00:20
The circle below is centered at the point (3, 1) and has a radius of length 2. what is the equation?
Answers: 1
question
Mathematics, 22.06.2019 02:30
There are three grizzly bears in the city zoo. yogi weighs 400.5 pounds, winnie weighs 560.35 pounds, and nyla weighs 628.29 pounds. what is the average weight of the three bears? (hint: what do they weigh all together? ) a. 502.97 pounds c. 604.38 pounds b. 529.71 pounds d. 794.57 pounds
Answers: 1
question
Mathematics, 22.06.2019 02:30
Iwill give brainliest. give accurate answer, . suppose tommy walks from his home at (0, 0) to the mall at (0, 5), and then walks to a movie theater at (6, 5). after leaving the theater tommy walks to the store at (6, 0) before returning home. if each grid square represents one block, how many blocks does he walk?
Answers: 2
You know the right answer?
Paul can install a 300-square-foot hardwood floor in 18 hours. Matt can install the same floor in 22...
Questions
question
Mathematics, 25.09.2020 05:01
question
Mathematics, 25.09.2020 05:01
Questions on the website: 13722367