subject
Mathematics, 08.07.2021 22:50 josuemarquezz27

A construction company needs 2 weeks to construct a family room and 3 days to add a porch. Find the ratio of the time it takes for constructing the porch to the time constructing the family room, with all units in days.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Marla bought a book for $12.95, a binder for $3.49, and a backpack for $44.99. the sales tax rate is 6%. find the amount of tax and the total she paid for these items
Answers: 1
question
Mathematics, 21.06.2019 19:20
Is the product of two rational numbers irrational or rational? first, make a hypothesis by multiplying two rational numbers. then, use variables such as x=a/b and y=c/d and the closure property of integers to prove your hypothesis.
Answers: 1
question
Mathematics, 22.06.2019 00:20
Acircle has a radius of 12.6cm what is the exact length of an arc formed by a central angle measuring 120
Answers: 1
question
Mathematics, 22.06.2019 01:30
(01.02 mc) asap plzzzwhich of the following correctly simplifies the expression 3 to the power of 2 multiplied by 5 to the power of 0 whole over 4, the whole squared.? select one: a. 3 to the power of 2 multiplied by 1 whole over 4, the whole squared. = 3 to the power of 1 multiplied by 1 squared over 4 squared. = 1 over 6.b. 3 to the power of 2 multiplied by 0 whole over 4, the whole squared. = 3 to the power of 4 multiplied by 0 over 4 squared. = 0c. 3 to the power of 2 multiplied by 0 whole over 4, the whole squared. = 3 to the power of 1 multiplied by 0 over 4 squared. = 0d. 3 to the power of 2 multiplied by 1 whole over 4, the whole squared. = 3 to the power of 4 multiplied by 1 squared over 4 squared. = 81 over 16.
Answers: 1
You know the right answer?
A construction company needs 2 weeks to construct a family room and 3 days to add a porch. Find the...
Questions
question
English, 08.10.2019 08:00
Questions on the website: 13722361