subject
Mathematics, 06.07.2021 01:00 nya6557

A company found that an experience surveyor can survey a roadbed in 6 hours. An apprentice surveyor needs 11 hours to survey the same stretch of road. If the two work together, find how long it takes them to complete the job.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
Describe how fraction strips can you order fractions
Answers: 2
question
Mathematics, 21.06.2019 14:50
Polygon mnopq is dilated by a scale factor of 0.8 with the origin as the center of dilation, resulting in the image m′n′o′p′q′. the coordinates of point m are (2, 4), and the coordinates of point n are (3, 5). the slope of is .
Answers: 2
question
Mathematics, 21.06.2019 18:00
The brain volumes (cm cubed) of 50 brains vary from a low of 904 cm cubed to a high of 1488 cm cubed. use the range rule of thumb to estimate the standard deviation s and compare the result to the exact standard deviation of 175.5 cm cubed, assuming the estimate is accurate if it is within 15 cm cubed
Answers: 2
question
Mathematics, 21.06.2019 19:50
The probability that a student graduating from suburban state university has student loans to pay off after graduation is .60. if two students are randomly selected from this university, what is the probability that neither of them has student loans to pay off after graduation?
Answers: 2
You know the right answer?
A company found that an experience surveyor can survey a roadbed in 6 hours. An apprentice surveyor...
Questions
question
Mathematics, 19.07.2019 02:30
Questions on the website: 13722362