subject
Mathematics, 02.07.2021 19:10 jacamron

The Sureset Concrete Company produces concrete. Two ingredients in concrete are sand (costs $6 per ton) and gravel (costs $8 per ton). Sand and gravel together must make up exactly 75% of the weight of the concrete. Also, no more than 40% of the concrete can be sand and at least 30% of the concrete be gravel. Each day 2000 tons of concrete are produced. To minimize costs, how many tons of gravel and sand should be purchased each day

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
Cara earns a base pay of $1800 per month at a car dealership plus a commission of 6% of her sales. what are caras total earning in a month in which she sells $40000 worth of merchandise
Answers: 3
question
Mathematics, 21.06.2019 16:20
Giuseppi's pizza had orders for $931.00 of pizzas. the prices were $21 for a large pizza, 514 for a medium pizza, and $7 for a small pizza. the number of large pizzas was two less than four times the number of medium pizzas. thenumber of small pizzas was three more than three times the number of medium pizzas. how many of each size of pizza were ordered?
Answers: 1
question
Mathematics, 21.06.2019 18:00
Based on the graph, what is the initial value of the linear relationship? a coordinate plane is shown. a line passes through the y-axis at -2 and the x-axis at 3.
Answers: 3
question
Mathematics, 21.06.2019 20:00
In one day there are too high tides into low tides and equally spaced intervals the high tide is observed to be 6 feet above the average sea level after six hours passed a low tide occurs at 6 feet below the average sea level in this task you will model this occurrence using a trigonometric function by using x as a measurement of time assume the first high tide occurs at x=0. a. what are the independent and dependent variables? b. determine these key features of the function that models the tide: 1.amplitude 2.period 3.frequency 4.midline 5.vertical shift 6.phase shift c. create a trigonometric function that models the ocean tide for a period of 12 hours. d.what is the height of the tide after 93 hours?
Answers: 1
You know the right answer?
The Sureset Concrete Company produces concrete. Two ingredients in concrete are sand (costs $6 per t...
Questions
question
English, 21.04.2020 18:31
question
Mathematics, 21.04.2020 18:31
Questions on the website: 13722363