subject
Mathematics, 30.06.2021 17:40 abbybarrera6187

The number of hours required to do a painting job is represented by the function , where f(x) gives the number of hours and x is the number of painters doing the job. How much time will {4, 10, 14, 16, 18} workers take to do the job?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
The radius of the base of a cylinder is 10 centimeters, and its height is 20 centimeters. a cone is used to fill the cylinder with water. the radius of the cone's base is 5 centimeters, and its height is 10 centimeters.
Answers: 1
question
Mathematics, 21.06.2019 16:30
The radius of the circle is 4 cm and the measure of the central angle is 90° the area of the sector with a central angle measuring 90° and radius of length 4 cm is vt cm the triangle in the sector is 4 cm the area of the triangle is v/cm² the area of the segment of the circle is (471 - ) cm?
Answers: 1
question
Mathematics, 22.06.2019 03:00
What percent of $1.00 are a nickel and a dime?
Answers: 3
question
Mathematics, 22.06.2019 03:30
Of the 50 us states 4 have names that start with the letter w
Answers: 2
You know the right answer?
The number of hours required to do a painting job is represented by the function , where f(x) gives...
Questions
question
Health, 28.08.2020 01:01
Questions on the website: 13722363