subject
Mathematics, 24.06.2021 03:00 marie0321rivera67

An oil-drilling rig has dug a hole to a depth of -60 ft. after one full day and night of continuous use. The rate of the rig stayed constant over that time.
Part A: The rig will be used to dig a second hole with a depth of -150 ft at the same rate as
before. How many hours will the rig take to complete digging the hole?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Which of the following is the missing term, a2, of the geometric sequence in which a1=2 and a3=200
Answers: 2
question
Mathematics, 21.06.2019 15:00
Find the balance at the end of 4 years if 1000 is deposited at the rate of
Answers: 2
question
Mathematics, 21.06.2019 22:00
Out of 50 students surveyed, 16 have a dog. based on these results, predict how many of the 280 students in the school have a dog.
Answers: 2
question
Mathematics, 22.06.2019 00:00
If (x + 8) is a factor of f(x), which of the following must be true? both x = โ€“8 and x = 8 are roots of f(x). neither x = โ€“8 nor x = 8 is a root of f(x). f(โ€“8) = 0 f(8) = 0
Answers: 3
You know the right answer?
An oil-drilling rig has dug a hole to a depth of -60 ft. after one full day and night of continuous...
Questions
question
Mathematics, 01.06.2021 17:50
question
Mathematics, 01.06.2021 17:50
question
Mathematics, 01.06.2021 17:50
question
Mathematics, 01.06.2021 17:50
question
Mathematics, 01.06.2021 17:50
question
Mathematics, 01.06.2021 17:50
question
Biology, 01.06.2021 17:50
Questions on the website: 13722363