subject
Mathematics, 22.06.2021 23:20 Gigglygoose4181

(04.06 MC) A bicycle manufacturing company makes a particular type of bike Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to
build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c
represents child bikes and a represents adult bikes, can the company build 5 child bikes and 15 adult bikes in a week.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Suppose that an airline uses a seat width of 16.516.5 in. assume men have hip breadths that are normally distributed with a mean of 14.414.4 in. and a standard deviation of 0.90.9 in. complete parts (a) through (c) below. (a) find the probability that if an individual man is randomly selected, his hip breadth will be greater than 16.516.5 in. the probability is nothing. (round to four decimal places as needed.)
Answers: 3
question
Mathematics, 21.06.2019 22:00
Iknow its nothing to do with education, but what type of thing should i wrote here? ? : ) its for mcdonald's btw.
Answers: 1
question
Mathematics, 22.06.2019 01:50
What will be the end result for the taxpayer who filed his federal income tax return using the 1040ez form shown belowa he'll owe $173b he'll receive a refund of $173c he'll owe $3921d he'll receive a refund of $3921
Answers: 2
question
Mathematics, 22.06.2019 05:20
Enter the amplitude of the function. f(x)=3cosx
Answers: 1
You know the right answer?
(04.06 MC) A bicycle manufacturing company makes a particular type of bike Each child bike requires...
Questions
question
Mathematics, 19.10.2019 01:20
question
Physics, 19.10.2019 01:20
question
Mathematics, 19.10.2019 01:20
question
Mathematics, 19.10.2019 01:20
Questions on the website: 13722367